25M HDMI Cable HIGH SPEED Long Lead with Ethernet ARC 3D | Designed in the UK |

€48.57
+ €11.06 Shipping

25M HDMI Cable HIGH SPEED Long Lead with Ethernet ARC 3D | Designed in the UK |

  • Brand: Unbranded

25M HDMI Cable HIGH SPEED Long Lead with Ethernet ARC 3D | Designed in the UK |

  • Brand: Unbranded
RRP: €65.57
Price: €48.57
You save: €17.00 (25%)
Sold by:
€48.57
+ €11.06 Shipping

In stock

We accept the following payment methods

Description

QUALITY MATERIALS: - Our HDMI cables are made to the highest standards. Featuring copper cable and double shielding to ensure smooth data transmission with no interference. Our long cables are ideal for extending your HDMI signal to other areas of the home or workplace. With a durable PVC jacket for easy routing in challenging areas25 METER HDMI CABLE: - 82FT High Speed HDMI to HDMI Long Lead with Ethernet and ARC (Audio Channel). Finished with 24K gold plated connectors for flawless crisp signal transmission. Our award winning HDMI cables are designed in the UK.PREMIUM : - Our cables have a 3-year extended as standard and are individually inspected straight on the assembly line. We pride ourselves in providing high quality items and outstanding customer .WIDE COMPATIBILITY: These cables are compatible with a range of devices that support HDMI. A perfect match for CCTV, Freeview/Freesat and Sky HD TV, PS4 & Xbox One Gaming Consoles, Blu-Ray & DVD Players, Home Cinema, AV Receivers, PC, Laptops, HDTV, Projectors. They are not compatible with Sky Q, PS4 Pro, Xbox One X and 4K Blu Ray Players when the resolution in set higher than 1080p.HIGH SPECIFICATION: Packed with high specifications including Ethernet, CEC, 3D and ARC (Audio Channel) Support. Immersive HD surround sound audio including 5.1 & 7.1 Dolby Atmos and DTS X audio. High Resolutions from 720p, 1080i and 1080p at 60Hz. No picture degradation at longer lengths
  • Fruugo ID: 339692285-745110773
  • EAN: 6497639346953

Product Safety Information

Please see the product safety information specific to this product outlined below

The following information is provided by the independent third-party retailer selling this product.

Product Safety Labels

CE Mark
Safety Warnings: Not suitable for children

Delivery & Returns

Dispatched within 2 days

  • STANDARD: €11.06 - Delivery between Fri 03 October 2025–Wed 15 October 2025

Shipping from China.

We do our best to ensure that the products that you order are delivered to you in full and according to your specifications. However, should you receive an incomplete order, or items different from the ones you ordered, or there is some other reason why you are not satisfied with the order, you may return the order, or any products included in the order, and receive a full refund for the items. View full return policy

Product Compliance Details

Please see the compliance information specific to this product outlined below.

The following information is provided by the independent third-party retailer selling this product.

Manufacturer
The following information outlines the contact details for the manufacturer of the relevant product sold on Fruugo.

  • Haikoujiabushukejiyouxiangongsi
  • Haikoujiabushukejiyouxiangongsi
  • Longhua District Huafa Building
  • Datong Street
  • Room B902
  • Haikou
  • China
  • 570102
  • fanhaiming1995@outlook.com
  • 1(705)9312905
  • https://www.uk/haikoujiabushukejiyouxiangongsi/m-14903

Responsible Person in the EU
The following information outlines the contact information for the responsible person in the EU. The responsible person is the designated economic operator based in the EU who is responsible for the compliance obligations relating to the relevant product sold into the European Union.

  • SUCCESS COURIER SL
  • SUCCESS COURIER SL
  • CALLE RIO TORMES NUM. 1, PLANTA 1, DERECHA,OFICINA 3,
  • Fuenlabrada,
  • Madrid
  • Spain
  • Spain
  • 28947
  • successservice2@hotmail.com