Extendable Dog Lead, Tangle-Free Retractable with Anti-Slip Handle 8m Long Leads Strong Nylon Tape,Suitable for Small Medium Large SZRH

€27.52
+ €9.83 Shipping

Extendable Dog Lead, Tangle-Free Retractable with Anti-Slip Handle 8m Long Leads Strong Nylon Tape,Suitable for Small Medium Large SZRH

  • Brand: Unbranded
Sold by:

Extendable Dog Lead, Tangle-Free Retractable with Anti-Slip Handle 8m Long Leads Strong Nylon Tape,Suitable for Small Medium Large SZRH

  • Brand: Unbranded

€27.52

Save €28.49 (50%)

RRP

€56.01
In stock
+ €9.83 Shipping
Sold by:

€27.52

Save €28.49 (50%)

RRP

€56.01
In stock
+ €9.83 Shipping

We accept the following payment methods

Description

STRONG & DURABLE DOG LEASH - Strong tape & tough dog leash , suitable for all small to large breeds. SIMPLE & CONVENIENT- One Button Lock & Release! A durable retractable extension cord w/full control gives your pet more freedom to roam. Great dog supplies puppy supplies! PERFECT FOR OUTDOOR USE - For walks, jogs or hikes - Great for walking dog, dog leads for walking, dog training leash, a fun cat leash or puppy leash! Anti-Slip soft handle for great grip control & all weather use - leash for big dogs, dog leashes for medium dogs and dog leashes for small dogs TOUGH & TOP QUALITY - Upgraded 360 tangle free, durable nylon tape & rust-proof swivel hook. Constructed w/ strong internal coil spring for consistent retraction. One of best leash for medium dogs & leash for small dogs on the market.
  • Brand: Unbranded
  • Category: Pet Leashes
  • Length: 5
  • Height: 5
  • Width: 5
  • Weight: 0.5
  • Fruugo ID: 436257398-914536665
  • EAN: 8253222488503

Delivery & Returns

Dispatched within 24 hours

  • STANDARD: €9.83 - Delivery between Thu 27 November 2025–Thu 04 December 2025

Shipping from China.

We do our best to ensure that the products that you order are delivered to you in full and according to your specifications. However, should you receive an incomplete order, or items different from the ones you ordered, or there is some other reason why you are not satisfied with the order, you may return the order, or any products included in the order, and receive a full refund for the items. View full return policy

Product Compliance Details

Please see the compliance information specific to this product outlined below.

The following information is provided by the independent third-party retailer selling this product.

Manufacturer
The following information outlines the contact details for the manufacturer of the relevant product sold on Fruugo.

  • Shenzhenyuandedianziyuouxiangongsi
  • Shenzhenyuandedianziyuouxiangongsi
  • Room 903, Building B, Nanxian Commercial Plaza, Nanyuan New Village
  • Hongshan Community, Minzhi Subdistrict, Longhua District
  • Longhua
  • Shenzhen
  • China
  • 518500
  • szrhkj21@163.com
  • 15819859068

Responsible Person in the EU
The following information outlines the contact information for the responsible person in the EU. The responsible person is the designated economic operator based in the EU who is responsible for the compliance obligations relating to the relevant product sold into the European Union.

  • Huang Pengliang
  • FORCHAIN GmbH
  • Vilbeler Landstra?e73 60388 Frankfurt am Main
  • Frankfurt am Main
  • Frankfurt am Main
  • DE
  • 60388
  • nnicolesusan093@gmail.com
  • 1638127736