Nintendo GameCube Controller Extension Cable 1.8m (6ft) - Extra Long Lead for Console

€7.95
+ €14.49 Shipping

Nintendo GameCube Controller Extension Cable 1.8m (6ft) - Extra Long Lead for Console

  • Brand: Unbranded
Sold by:

Nintendo GameCube Controller Extension Cable 1.8m (6ft) - Extra Long Lead for Console

  • Brand: Unbranded

€7.95

Save €7.00 (46%)

RRP

€14.95
In stock
+ €14.49 Shipping
Sold by:

€7.95

Save €7.00 (46%)

RRP

€14.95
In stock
+ €14.49 Shipping

We accept the following payment methods

Description

Extension Cable Lead For NINTENDO GAMECUBE Console Controller Extender 1.8m 6ft Controller Extension Cable x 1 Compatible with NINTENDO GAMECUBE CONTROLLERS 6 foot / 1.8 metres extension lead
  • Fruugo ID: 423703270-891424515
  • EAN: 7615821172633

Product Safety Information

Please see the product safety information specific to this product outlined below

The following information is provided by the independent third-party retailer selling this product.

Safety Warnings: Please use according to the instructions or product details!

Delivery & Returns

Dispatched within 2 days

  • STANDARD: €14.49 - Delivery between Thu 06 November 2025–Fri 14 November 2025

Shipping from China.

We do our best to ensure that the products that you order are delivered to you in full and according to your specifications. However, should you receive an incomplete order, or items different from the ones you ordered, or there is some other reason why you are not satisfied with the order, you may return the order, or any products included in the order, and receive a full refund for the items. View full return policy

Product Compliance Details

Please see the compliance information specific to this product outlined below.

The following information is provided by the independent third-party retailer selling this product.

Manufacturer
The following information outlines the contact details for the manufacturer of the relevant product sold on Fruugo.

  • Lin Xiaohong
  • Dongguan Beijian Technology Co., Ltd.
  • Room 1006-1007, No. 82, Hongfu West Road, Nancheng Section Nancheng Subdistrict Dongguan
  • Dongguan
  • CN
  • 523073
  • ran8878bachenfan0@163.com
  • 15625659735

Responsible Person in the EU
The following information outlines the contact information for the responsible person in the EU. The responsible person is the designated economic operator based in the EU who is responsible for the compliance obligations relating to the relevant product sold into the European Union.

  • Van Lavazza
  • Y & H S.R.L.
  • Via Gravina 21 MT matera,Trani,Puglia
  • Trani
  • Italy
  • 75100
  • itlyhsrl@gmail.com
  • 0039 3917722149